Free business tool

Lead source ROI calculator

Compare two sources using your own leads, closes, acquisition spend, referral fees, and cost to complete the work.

Comparison assumptions

Use the same time period and comparable work for both sources. Switching business type reloads the profile options.

Source A

Source B

A source fee is modeled as a percentage of gross revenue on each closed job or side. Closes cannot exceed leads. This comparison excludes taxes and the value of future repeat business.

Source comparison

Source A · Paid platform

$1,600

Estimated total profit after delivery, fees, and source spend

Profit per lead
$40
Acquisition cost per close
$600
Lead-to-close rate
20.0%
Break-even closes
3

Source B · Client referrals

$4,700

Estimated total profit after delivery, fees, and source spend

Profit per lead
$235
Acquisition cost per close
$17
Lead-to-close rate
30.0%
Break-even closes
1

Source B shows $195 more estimated profit per lead. Results reflect these inputs, not a prediction of future performance.

How the numbers are built

Per source: closed revenue minus delivery costs, close-based referral fees, and acquisition spend. Profit per lead divides that result by leads received. Acquisition cost per close adds spend per close to the close-based referral fee.

Choose your print format

Internal comparison link

The link shows your revenue, costs, spend, and conversion. Share it only with people you trust.

Anyone with this link can see the business assumptions and results.

Illustrative business estimate. Use actual figures from a consistent period, and check whether each source sends comparable opportunities. Small samples can swing widely.

How to use this comparison

Compare equivalent opportunities

Use a single month or quarter for both sources. Count leads that entered during that period and closes from the same cohort where possible. Older leads may close later, so a short period can understate conversion.

Count every acquisition charge

Put ad or platform spend in the spend field. Put a percentage charged at closing in the referral-fee field. Include paid follow-up or other acquisition costs in spend if you can estimate them; avoid counting the same charge twice.

Interpret profit per lead

A larger source can have higher total profit while another has a better return per lead. Review both values alongside lead volume and your capacity to handle more work. A zero-close source shows its spend as a loss.

Check what is outside the model

Revenue and delivery costs are held equal across sources. Adjust them if the sources bring different job sizes or commission amounts. Repeat clients, referrals, refunds, taxes, and the time value of follow-up are not projected.